Form of tender
A tender is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods or services. An invitation to tender might be issued for a range of contracts, including: equipment supply, the main construction contract (perhaps including design by the contractor), demolition, enabling works, and so on.
An invitation to tender might include:
- A letter of invitation to tender.
- The form of tender.
- Preliminaries.
- The form of contract.
- A tender pricing document.
- A drawing schedule.
- Design drawings.
- Specifications.
The form of tender is prepared by the client or their consultants and completed and signed by the tenderer. It is a formal acknowledgement that the tenderer understands and accepts the terms of conditions of the tender documents and any other requirements that are stipulated.
Items that might be appear on a form of tender could include:
- Latest return time and date.
- Date, name and address.
- Tender reference number.
- The price for which they are to do the works and any adjustments prices that have been agreed should the scope of the work or period of time change (or a reference to documents providing this information).
- The date until which the price remains valid.
- The period of time that is allocated for the works, or an actual completion date if required.
- Acceptance of terms and conditions.
- Confirmation of the country’s law that will govern the contract.
- References to other documents containing information.
- Any qualifications that apply.
- Who will bear the costs of preparing the tender.
- Any alternative proposals (or a reference to documents providing this information).
- Confirmation of the tender being genuine and bona fide.
- Signature and tenderer details.
Some of these items may be filled out by the client or their consultants in advance, so that the tenderer only has to agree and sign.
[edit] Related articles on Designing Buildings Wiki
- Bid strategies.
- Common mistakes in construction tenders.
- Contract documents for construction.
- Construction contract.
- Contract conditions.
- Contract engrossment.
- Contract execution.
- Contractual documents.
- Negotiated contract.
- Schedules of work.
- Specifications.
- Tender.
- Tender documents.
- Tender negotiations.
- Tender processes.
- Tender return slip.
- Tender settlement meeting.
- Tender submission.
- Things to avoid when tendering.
- Variant bid.
[edit] External references
- Felp - Sample form tender
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.