Form of tender
A tender is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods or services. An invitation to tender might be issued for a range of contracts, including: equipment supply, the main construction contract (perhaps including design by the contractor), demolition, enabling works, and so on.
An invitation to tender might include:
- A letter of invitation to tender.
- The form of tender.
- Preliminaries.
- The form of contract.
- A tender pricing document.
- A drawing schedule.
- Design drawings.
- Specifications.
The form of tender is prepared by the client or their consultants and completed and signed by the tenderer. It is a formal acknowledgement that the tenderer understands and accepts the terms of conditions of the tender documents and any other requirements that are stipulated.
Items that might be appear on a form of tender could include:
- Latest return time and date.
- Date, name and address.
- Tender reference number.
- The price for which they are to do the works and any adjustments prices that have been agreed should the scope of the work or period of time change (or a reference to documents providing this information).
- The date until which the price remains valid.
- The period of time that is allocated for the works, or an actual completion date if required.
- Acceptance of terms and conditions.
- Confirmation of the country’s law that will govern the contract.
- References to other documents containing information.
- Any qualifications that apply.
- Who will bear the costs of preparing the tender.
- Any alternative proposals (or a reference to documents providing this information).
- Confirmation of the tender being genuine and bona fide.
- Signature and tenderer details.
Some of these items may be filled out by the client or their consultants in advance, so that the tenderer only has to agree and sign.
[edit] Related articles on Designing Buildings Wiki
- Bid strategies.
- Common mistakes in construction tenders.
- Contract documents for construction.
- Construction contract.
- Contract conditions.
- Contract engrossment.
- Contract execution.
- Contractual documents.
- Negotiated contract.
- Schedules of work.
- Specifications.
- Tender.
- Tender documents.
- Tender negotiations.
- Tender processes.
- Tender return slip.
- Tender settlement meeting.
- Tender submission.
- Things to avoid when tendering.
- Variant bid.
[edit] External references
- Felp - Sample form tender
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.